PAINTING

How to Estimate Parking Lot Striping

Contractor method for pricing line painting, stalls and symbols in a parking lot.

Parking lot striping is paint area plus per-stall labor plus symbols. The line width and the paint type decide the material, and the symbols add fixed work.

THE SHORT ANSWER

How do you estimate parking lot striping?

Multiply line footage by width for the painted area, then add per-stall and per-symbol labor. 600 ft of 4-inch lines is 200 sq ft at $2.50 plus 20 stalls and 2 symbols for $780.

01

Measure the lines

Total the linear feet of stall lines, arrows and islands. Multiply by the line width for the painted area.

02

Set the paint rate

Waterborne paint is cheaper and covers the basics; thermoplastic lasts longer but costs more per area.

  • Waterborne
  • Thermoplastic
  • Line width
  • Stall count
03

Add stalls and symbols

Each stall carries a per-stall labor cost, and handicap, arrow and stop symbols carry their own fixed cost.

04

Total and validate

200 sq ft at $2.50 is $500 plus 20 stalls at $10 and 2 symbols at $40 for $280, totaling $780. Use the Parking Lot Striping Cost Calculator.

TRY THE TOOL

JOB INPUTS

Enter your numbers

Loading saved values

Number of parking stalls

Number of parking stalls

Lines, arrows and islands

ft
Lines, arrows and islands

Stripe width

in
Stripe width

Waterborne or thermoplastic

Waterborne or thermoplastic

Handicap, arrows, stop

Handicap, arrows, stop

Crew hourly cost

$/h
Crew hourly cost
Results update automatically
CALCULATED RESULTUSD
Estimated striping cost$780.00
Line area200.0 sq ft
Paint$500.00
Labor$280.00
FORMULA USED200.0 × $2.50 + 20 stalls × 10 + 2 symbols × 40 = $780.00
NEXT STEP

Turn the checklist into real job numbers.

Open contractor tools