How to Order Material with Waste

Contractor method for adding waste to a net quantity and rounding up to the selling unit.

Net quantities do not cover cuts, offcuts and mistakes. Adding a waste percentage and rounding up to the pack keeps you from running out mid-job.

THE SHORT ANSWER

How do you order material with waste?

Multiply the net quantity by 1 plus the waste percentage, then round up to whole packs. 500 units at 10% waste is 550, and 25-unit packs means ordering 22 packs (550).

01

Start with the net quantity

The net quantity is what the finished work needs with no allowance. Measure it carefully from the takeoff.

02

Add the waste percentage

Waste covers cuts, offcuts and errors. Ten percent is a common default, but adjust for the material and the layout.

  • Net quantity
  • Waste %
  • Quantity + waste
  • Selling unit
03

Round up to the selling unit

Materials sell in packs, bundles or pieces. Round the quantity with waste up to whole packs.

04

Order the rounded quantity

500 units at 10% waste is 550. In packs of 25 that is exactly 22 packs. If the result were not a whole pack, round up anyway. Use the Material Waste and Order Quantity Calculator.

TRY THE TOOL

JOB INPUTS

Enter your numbers

Loading saved values

Quantity actually needed

Quantity actually needed

Cuts, offcuts and errors

%
Cuts, offcuts and errors

Selling unit per pack or bundle

Selling unit per pack or bundle
Results update automatically
CALCULATED RESULTUSD
Packs to order22 packs
Quantity + waste550.0
Order quantity550
Waste units50.0
FORMULA USED500 × (1 + 10.0%) = 550.0 → 22 packs × 25 = 550