HOW TO USE IT
How to use the Remodeling Budget Calculator
- 1
Enter labor, materials and fixtures.
- 2
Add a contingency percentage for surprises.
- 3
Set the profit percentage you want to earn.
- 4
Review the subtotal, reserves and final budget.
THE MATH
Remodeling budget formula
Budget = subtotal × (1 + contingency%) × (1 + profit%)The three direct costs form a subtotal. Contingency cushions surprises, and profit is calculated after that reserve.
PRACTICAL EXAMPLE
A kitchen refresher
$8,000 labor + $5,200 materials + $2,200 fixtures equals a $15,400 subtotal. With 10% contingency and 15% profit, the budget is about $19,480.
FAQ
Frequently asked questions
What is a contingency reserve?
It is a budget buffer for unexpected conditions found during demolition or installation, such as wiring, plumbing or rot.
Is this a final quote?
No, it is a preliminary planning budget. A detailed takeoff based on the final scope produces the real quote.