FLOORING

How to Bid a Flooring Installation Job

How to bid flooring installation profitably: material grade, waste, prep, stairs and transitions.

Flooring bids lose money on prep. The material is simple — the removal, subfloor repair and stairs are where the hours disappear.

THE SHORT ANSWER

How do you bid a flooring job?

Confirm the exact product and grade, measure waste (5-15%), inspect the subfloor, and quote material, labor, removal, underlayment, stairs and transitions as line items. LVP runs $5-13/sq ft installed; hardwood $6-25/sq ft.

01

Confirm the product and grade

LVP, laminate, hardwood and engineered wood all carry different material and labor rates. Confirm the exact product and grade before quoting, because a 'wood floor' can mean $4/sq ft or $15/sq ft.

02

Measure waste and prep

Add 5-10% waste for straight lays, 15% for diagonals. Check the subfloor, ask about old-floor removal, and count stairs and transitions — each is a line item.

03

Quote the line items

Material, labor, removal, underlayment, stairs and transitions are separate line items. Use the Flooring Installation Cost Calculator and stay within 10% before markup.

04

Set the trip and prep minimums

Small jobs need a minimum. A 200 sq ft room is a half-day trip for a crew; price the mobilization, not just the square footage.

NEXT STEP

Turn the checklist into real job numbers.

Open contractor tools