An active sub-slab system on one floor with one fan and 12 labor hours at $65 totals about $2,280.

JOB INPUTS

Enter your numbers

Loading saved values

Active, crawlspace or passive

Active, crawlspace or passive

Floors served

Floors served

Number of mitigation fans

Number of mitigation fans

Installation hours

h
Installation hours

Crew hourly rate

$/h
Crew hourly rate
Results update automatically
CALCULATED RESULTUSD
Estimated system cost$2,280.00
Base$1,200.00
Fans$300.00
Floors$0.00
Labor$780.00
FORMULA USED$1,200.00 + 1 × $300.00 + $0.00 + 12h × $65.00 = $2,280.00

HOW TO USE IT

How to use the Radon Mitigation System Cost Calculator

  1. 1

    Choose the system type: Active sub-slab pulls radon from under the slab with a fan; crawlspace systems ventilate a crawl space; passive systems rely on stack effect.

  2. 2

    Fans drive the cost: Each mitigation fan adds a significant line. Most homes need one fan; larger or split slabs may need two.

  3. 3

    Floors change the routing: A multi-story home needs longer pipe routing and more labor to pull the radon up and out. Add a per-floor charge.

  4. 4

    Test after install: A mitigation system is verified by a post-install radon test. Confirm who runs the test and include the cost.

THE MATH

Radon mitigation calculation method

An active sub-slab system on one floor with one fan and 12 labor hours at $65 totals about $2,280.

Each mitigation fan adds a significant line. Most homes need one fan; larger or split slabs may need two.

PRACTICAL EXAMPLE

Worked example for Radon mitigation

An active sub-slab system on one floor with one fan and 12 labor hours at $65 totals about $2,280.

FAQ

Frequently asked questions

How to Estimate a Radon Mitigation System

An active sub-slab system on one floor with one fan and 12 labor hours at $65 totals about $2,280.

What should I verify before using the result?

Active sub-slab systems are the most common and effective; crawlspace and passive systems are cheaper but less reliable.

Is this a final quote or design?